Link 1 · water
Delivers
Radunia Canal
The canal was built by the Teutonic Knights in 1348–1356 to bring water to Gdańsk and drive mills; the wheels of the Great Mill used its water. Head and flow: undetermined.
V2 source [1] · to be verified
The same river, two ways to work: one ends in flour, the other in electricity. This compares routes; it is not a ranking.
Link in the chain — both tracks will show it at once
Schematic of a typical mill. The arrangement of the Great Mill's wheels is not documented here.
Link 1 · water
Radunia Canal
The canal was built by the Teutonic Knights in 1348–1356 to bring water to Gdańsk and drive mills; the wheels of the Great Mill used its water. Head and flow: undetermined.
V2 source [1] · to be verified
Link 2 · rotation
water wheel and gearing
In a typical mill, a water wheel turns a shaft, and gearing carries the motion to the working machinery and adjusts its direction and speed.
general description, not a document
Link 3 · work
grain into flour
The drive moves the grinding device. In this schematic the work stays on site: rotation becomes work on the grain.
general description, not a document
Product
for use at the mill
Bielkowo · commissioned 1925 · diversion scheme
Bielkowo is shown. Łapino is described in the Explanation section.
Link 1 · water
diversion of the Radunia loop
Instead of flowing around the whole bend, part of the water was sent through an artificial channel: the diversion scheme concentrates the head at the power station. The operator gives an impoundment height of 44.5 m.
V2 source [2] · to be verified
Link 2 · rotation
three Francis turbines
The operator gives three hydro-generating sets with Francis turbines. The runner takes energy from the water and passes the motion through a shaft to the generator.
V2 source [2] · to be verified
Link 3 · work
motion into electricity
The generator converts mechanical energy into electrical energy, which can be sent to consumers away from where the turbine works. The result does not have to be used at the river.
general description of a generator
Product
to the grid, out of the valley
Common and different
In common
Different
Model calculation · not a measurement
Model: gross hydraulic power P = ρ · g · Q · H (ρ = 1000 kg/m³, g = 9.81 m/s²), i.e. about 9.81 kW for every m³/s and every metre of head. Useful power is P multiplied by the efficiency η. The values of Q, H and η are assumptions for playing with the calculation; they do not describe the actual output of any facility.
Without JavaScript: for the example Q = 4.0 m³/s and H = 44.5 m (the impoundment height given by the Bielkowo operator, used as an assumption) the model gives 1,746.2 kW gross and 1,484.3 kW useful at an example efficiency of 85%.
Model result
At Q = 4.0 m³/s and H = 44.5 m the model gives 1,746.2 kW gross, of which 1,484.3 kW is useful at η = 85%.
Explanation · scope of the material
The same order of links for three facilities. The descriptions come from the V2 material and point to sources; they were not re-checked in this run. A missing figure means no figure, not zero.
Bielkowo and Łapino are active energy facilities. This page does not set out routes or viewpoints. Look only from public roads, bridges and marked places; do not enter the power station grounds, the dam crest or the working river channels.
The pictograms and tracks are this page's own schematics, not a map or a technical drawing. Sizes and proportions do not correspond to any facility. No photograph is embedded: version V2 used an external photo of the weir at Bielkowo (file on Wikimedia Commons, per V2 by Krzysztof Rakowski, CC BY-SA 3.0; status not checked in this run).
A quiz with scoring — comparing the tracks itself shows the roles of the links. A notebook with browser storage and export — not needed to understand the topic; V3 neither saves nor reads anything. Notes saved earlier in V2 (key atlas-v2-1) remain in the browser and can be deleted in its settings.