Period 1
Spring
March–April · supply 160 c.u.
Start of the season: filling after winter.
A 58% · B 58% · C 75%
A28.8 / 50 c.u. · 58%evaporation −2.0 c.u.
↘ B 84.2overflow 65.0 · monk 19.2
B58.2 / 100 c.u. · 58%evaporation −3.0 c.u.
↘ C 63.0overflow 24.2 · monk 38.8
C149.9 / 200 c.u. · 75%evaporation −3.1 c.u.
→ out of cascade 0.0overflow 0.0 · monk 0.0
conventional threshold ≥65% — ✓ met
retention 145.0 + intake 100.0 − evaporation 8.1 − outflow 0.0 = 236.9 c.u. · closure: difference 0.0