Benchmarks of the great levelling

The difference between two staff readings carries height from one benchmark to the next. Three stations lead from A through B and C back to A — and there the calculation should return the height it started from. Change a reading and see how far the loop opens.

Loop calculation: three stations and the return to A

A100.000m

starting benchmark — height given in the exercise

Station 1 · A → B

+0.550m

Δh = w − p = 1.425 − 0.875

B100.550m

matches the reference

Station 2 · B → C

−0.530m

Δh = w − p = 1.120 − 1.650

C100.020m

matches the reference

Station 3 · C → A

−0.020m

Δh = w − p = 0.950 − 0.970

A′100.000m

the same benchmark A, height from the calculation after three stations

Return to A · gap fh

0mm

A′ = A: the calculation returned to the height of benchmark A.

Previous result: none — nothing has been changed yet.

Loop balance

Δh1+0.550m

Δh2−0.530m

Δh3−0.020m

Σ0.000m

Σw − Σp = 3.495 − 3.495 m

In a reading field the ↑ ↓ arrows change the value by 1 mm and the −5 and +5 buttons by 5 mm. Staff range in the exercise: 0.100–3.500 m. An empty reading is not zero — the calculation then pauses.

Exercise reference: we assume that B = H₀ + 0.550 m and C = H₀ + 0.020 m are true, so that you can see which point the measurement has shifted. In the field you do not know the truth — you have only the readings and the balance. The length of the gap on the left edge is schematic and linear up to 100 mm: a gap of 100 mm or more takes up 80% of the side length (the rest is shared between the two short segments of the mark).

What the closure says

Closure 0 mm — the calculation agrees.

The sum of the backsights equals the sum of the foresights, and points B and C agree with the exercise reference. This is agreement of the balance, not proof of a flawless measurement: mistakes of opposite signs also give zero (the “Errors cancel out” case).

One scale, 0–100 mm

Exercise threshold T5 mm

Now |fh|0 mm

Previously |fh|none

0100 mm or more (scale truncated)

Reading scenarios

Changes the stated heights; does not change the differences or fh.
The exercise’s own threshold (0–100 mm), not a standard. Changes the assessment and the threshold bar.

One station

Two staffs, one horizontal sight line, one difference

The level stands between the points and defines a horizontal line of sight. The backsight reading w measures the distance from the starting point to that line, the foresight reading p from the end point. The difference w − p is the height difference: a positive value means that the foresight point lies higher [2]. The height of the sight line drops out of the result: raise it by 100 mm and both readings grow by the same amount (the “Different sight-line height” scenario).

Diagram of a single levelling station Original drawing: a level between two staffs defines a horizontal sight line. Reading w (solid bracket, on the left) is measured from the starting point to the sight line, reading p (dashed bracket) from the end point to the sight line; their difference is the height difference Δh (thick bracket on the right). The labels w, p, Δh, A and B are in HTML beside the drawing. The exact numbers are given in the list below the drawing.
The red dashed line is the level’s horizontal sight line. The bracket style matches the label and the marker in the list below: thin solid — w, dashed — p, thick — Δh; the letters A and B stand under the feet of the staffs. In a narrow layout the labels w, p, Δh are replaced by the list below the drawing. Original diagram, not to horizontal scale; the vertical has a constant scale (40 drawing units = 1 m) for all stations. Exercise data, invented.

Station 1 · A → B

Backsight staff, at point A
w = 1.425 m
Foresight staff, at point B
p = 0.875 m
Height difference Δh = w − p
+0.550 m — B lies 0.550 m higher than A

Limits of closure

Closure is a balance, not an accounting of the points

The loop returns to A and says only how large the sum of the mistakes is. It does not say at which station they arose, and it does not rule out mistakes of opposite signs. That is why checks independent of the balance are added in the field, for example a second reading on the second graduation of the staff or a measurement in the opposite direction [2] [3]. Five cases from the exercise, calculated for T = 5 mm and any H₀:

Text log (second layer, ready to copy)
LEVELLING LOG · TEACHING MODEL · loop A → B → C → A
H(A) = 100.000 m · exercise threshold T = 5 mm
stn 1  A→B   w = 1.425 m   p = 0.875 m   Δh = +0.550 m   H(B) = 100.550 m
stn 2  B→C   w = 1.120 m   p = 1.650 m   Δh = −0.530 m   H(C) = 100.020 m
stn 3  C→A   w = 0.950 m   p = 0.970 m   Δh = −0.020 m   H(A′) = 100.000 m
Σw = 3.495 m · Σp = 3.495 m · f_h = Σw − Σp = 0 mm
Invented data; conventional layout; this is not a measurement or surveying instructions.

Scope and uncertainties

What this page assumes and what it does not check

For the reviewer: what changed relative to V2
  • The “Whole loop / Stn 1–3” cards were replaced: the loop is visible all the time, and the detail of a station has its own section with a station selector.
  • Six scenarios were cut to five: the two counterexamples of compensation (backsight and foresight readings) were reduced to one, because they teach the same thing.
  • Saving in the browser’s storage was removed; nothing is stored, and reset restores the starting data.
  • Copying the log was moved to an expandable second layer.
  • The benchmark photograph from Wikimedia Commons is no longer embedded (the page works offline); it remains as a link in the sources.
  • Retained: the formula Δh = w − p, the sums Σw and Σp, the choice of H₀, the custom threshold T, all scenario values and their closures.

Sources

Where to check the rules

  1. GUGiK · Produkty projektu GBDOT [GBDOT project products]Vertical control network — definition and use. Link from V2; not checked in V3.
  2. NOAA / NGS · Geodetic Leveling (NOS NGS 3)Backsight minus foresight; the levelling line and sources of error (chapter 3 according to V2). Link from V2; not checked in V3.
  3. ZPE · Pomiary sytuacyjne i wysokościowe [Planimetric and height surveys]Polish-language educational material on geometric levelling. Link from V2; not checked in V3.
  4. Geoportal · Podstawowe osnowy, PRPOG [Basic control networks, PRPOG]Scope of the register and access to point data; the proper starting point for verifying a specific benchmark. Link from V2; not checked in V3.
  5. Wikimedia Commons · Benchmark on the Old Town Hall in ToruńPhotograph from 2008, author: Pko, licence CC BY-SA 4.0 according to the V2 description. Link only — the photograph is not embedded in this page; it documents the mark, not its current condition or height.