1Straight movement
- Registrations in the corridor
- 1
- Upstream movement
- 1
- Downstream movement
- 0
- Candidate for an upstream passage
- 1to be confirmed by a specialist
For the register: upstream movement, to be verified.
Rega · Płoty model of a corridor with a camera
Fish pass on the Rega · sequence from the corridor
A camera in the fish pass corridor records an object, but the counter only makes sense once the direction has been established. The four frames below are a teaching model, not a recording from Płoty.
Event
Select two frames. A third click replaces the oldest choice, and changing the event keeps the selected pair.
Frame 10.0 s
← water flowupstream →
start of pair
Frame 20.4 s
← water flowupstream →
Frame 30.8 s
← water flowupstream →
Frame 41.2 s
← water flowupstream →
end of pair
Teaching model: four frames of a model sequence drawn in code, not a recording from Płoty. Downstream on the left, upstream on the right, water flow shown by an arrow pointing left.
Event 1 · straight movement
Selected frames: 1 → 4 · interval 1.2 s
Upstream
The position changed from 8% to 92% of the corridor length, that is by 84% in 1.2 s. The object moved towards the upper water. The intermediate frames (2, 3) take no part in this result.
One scale for all events: 0% is the entrance on the lower-water side, 100% is the exit towards the upper water. The values come from a model; we do not know the real length of the corridor. The hatched area means no data, not zero.
Rule 1. A single frame only tells you where the object is. Direction is the difference in position over time, so two frames are needed. Click another pair: in a straight movement every pair points the same way.
Each of the three events leaves one registration in the raw counter. But only the first can become a candidate for an upstream passage, and only once a specialist has confirmed it. The summary shows all three at once.
For the register: upstream movement, to be verified.
For the register: turn-back. One object and two movements, not two fish and not a passage.
For the register: unreadable. Neither a passage nor an established absence of passage.
Suppose the counter has registered a certain number of events. If some of them are downstream movements and turn-backs, and some of the images are unreadable, there are fewer candidates for an upstream passage than registrations. You set the shares yourself: they are assumptions, not a measurement from the Rega. The input fields work only with JavaScript; without it you see just the example: 40 events, 15% downstream movements and turn-backs, 20% unreadable, that is 40 = 26 + 6 + 8.
40 = 26 + 6 + 8
Rounded to whole events; the three buckets always add up to the counter.
Positions are given as a percentage of the corridor length: 0% is the entrance on the lower-water side, 100% is the exit towards the upper water. These are model values.
According to the 2021 Wody Polskie procurement, Płoty is one of two locations for new fish monitoring equipment in fish passes on the Rega (the other is Łobez). The camera shot shows a single place along the whole route a fish takes through a series of pools.
The orange dot is a notional fish. The dashed rectangle is the corridor with the camera, in the sixth of the seven sections (stage 5); its position in the diagram is notional.
Stage 0 · entrance
Fish have to find the entrance to the fish pass. What matters is its position and the stream of water that guides them to the passage.
Stage 1 · pool 1
A pool-type fish pass divides the difference in level into stages. A fish passes through an opening or a slot, depending on the design.
Stage 2 · pool 2
The pool gives the fish a place to rest. It also dissipates the energy of the water so that it is not carried in full into the next chamber.
Stage 3 · pool 3
The conditions for passage have to be matched to the species and size of the fish. This diagram does not simulate their swimming ability.
Stage 4 · pool 4
Instead of one large difference in level there is a series of smaller steps. In a real structure, flow and keeping the pass unobstructed also matter.
Stage 5 · corridor with the camera
Before the exit to the upper water, the system registers objects between two plates. This field of view is what the four frames at the top of the page show: downstream on the left, upstream on the right. Back to the frames.
Stage 6 · exit
The notional fish has reached the point above the obstacle. This is the end of the diagram, not a measurement of the effectiveness of a real fish pass.