A · clear route
Upper bound of the range. It is not known whether this is the case.
- retained
- 36 mm
- free
- 20 mm
- removed by drain
- 24 mm
- excess outside the strip
- 10 mm
42 + 60 − 12 − 24 − 10 = 56 mm
Greater Poland · teaching diagram A-1
The plan shows intent. Whether the pipe was built and whether it carries water today are separate pieces of evidence. Select a segment and see what is missing.
The front is a drawing, not a photograph: we have no photograph of a field with usage rights. The dashed line on the front is the position of the segment according to the plan, not a trace in the field. The line type on the reverse shows the kind of evidence (legend). Diagram A-1 is a model, not a plan of any plot.
Without JavaScript you see the initial state: all segments are only designed; construction and today’s state have not been checked.
Select a segment (or tap a line on the reverse)
Route from the selected segment to the ditch: three layers of evidence
You cannot say that Lateral S2 is working: the route S2 → Z1 → Z0 → ditch has not been confirmed as clear. Presence on the plan proves nothing here on its own.
The plan shows intent. A construction record shows that someone laid the pipe, or that no trace of it was found in the files. An observation or test today shows the state on the day of observation. No layer replaces the next. Water flows through a single series: if one link on the route to the ditch is broken or unexamined, a conclusion about the whole pipeline is unwarranted. Below you enter what evidence you would have in hand. This is an exercise on model A-1, not a register of a real network.
Example evidence combinations (model)
Links on the route to the ditch
Conclusion for the selected route
You cannot say that Lateral S2 is working: the route S2 → Z1 → Z0 → ditch has not been confirmed as clear. Presence on the plan proves nothing here on its own.
Still to check whether a construction record exists: S2, Z1, Z0.
Missing an observation or test of today’s state: S2, Z1, Z0.
“Not found” means only that the source search returned no result. It is not proof that there is no pipe. “Clear” refers to the day of observation.
On the front of the sheet the round marker by the ditch shows the state of outlet Z0 alone: “?” not checked, “✓” clear, “×” broken.
The strip of soil above segment Lateral S2 receives rain. The retained pool (notional 40 mm) stays in the micropores and the drain does not take it. The free pool (notional 20 mm) can be removed up to the limit, but only if the route to the ditch is clear. Both columns count the same rain. Which of them may be taken as the result depends on the evidence from part 2; where it is missing, the result is a range. Start: 30 + 12 mm; the capacities and the limit are teaching parameters, not measurements from Greater Poland.
Result unknown. After 3 steps the drain will carry away between 0 and 24 mm, and the excess leaving the strip will be between 10 and 34 mm.
First tops up the retained pool (up to 40 mm); the rest feeds the free pool.
Removes water only from the retained pool.
How much the drain can remove from the free pool when the route to the ditch is clear (model assumption).
The step is repeated this many times with the values above.
Without JavaScript the sliders are unavailable and the figures beside them show the default values: rainfall 20 mm per step, evapotranspiration 4 mm, drain limit 8 mm, 3 steps.
Upper bound of the range. It is not known whether this is the case.
42 + 60 − 12 − 24 − 10 = 56 mm
Lower bound of the range. It is not known whether this is the case.
42 + 60 − 12 − 0 − 34 = 56 mm
Equation: start 42 mm + rainfall − evapotranspiration − drain − excess = end. The sum balances in both columns.
The 8 mm limit per step is a model assumption (column A). Column B is the same rain with a break in the network: 0 mm. An unverified segment is a range between them, not a value in the middle.
Kept: the chain of continuity to the ditch, the unverified state as a range instead of a single number, the two 40/20 mm pools in the same order within a step, conservation of the total, the sources.